City of Welch, WV – Water Project Experience

City of Welch, WV – Water Project Experience

City of Welch, WV – Water Project Experience

Location: Welch, West Virginia

Project: Welch Water Treatment Plant Upgrade. The project called for removal of the existing roof and installation of a new roof, replacement of the existing electrical system, demolition of three pressure filters, installation of a 4-cell gravity sand filter, replacement of two high service pumps, HVAC upgrades. In addition, the project also called for installation of approximately 7,000 LF of 12” PVC AWWA 200 water main, valves, hydrants, air release valves, service lines and reconnections, and all appurtenances.
Est. Cost: $3,000,000
Status: Completed May 2017

Project: McDowell Street/Riverside Drive Waterline Replacements
Design, Construction Administration & Inspection
Approximately 4,609 feet of 12”, 10”, 8”, and 6” water main along McDowell Street
Approximately 5,732 feet of 12”, 10”, 8”, 6”, and 2” water main along Riverside Drive
Est. Cost: $3,400,000
Status: Starting Construction

Project: Indian Ridge Industrial Park Water Infrastructure
Four contracts totaling over $7M in costs. 6.5 miles of 2” – 16” new waterlines, two 500,000 gallon water storage tanks, and two water booster stations. 434 new meter settings.
Est. Cost: $3.6M Bid Cost
Status: Completed

Project: Miscellaneous Water Storage Tank Replacement & Renovations
300,000 gallon ground storage tank, 130,000 ground storage tank, demolition of existing water storage tank, sandblasting and painting of existing 100,000 and 20,000 gallon water storage tanks, rehabilitation of existing 400,000 gallon water treatment reservoir
Status: Completed

Photos

Client:
City of Welch, WV

Service Type:
Civil Engineering 

Project Value:
N/A

Completion Date:
N/A

Project Area:
N/A

BCPSA Route 83 Line Replacement – Flannagan to Vansant

BCPSA Route 83 Line Replacement – Flannagan to Vansant

BCPSA Route 83 Line Replacement – Flannagan to Vansant

The Buchanan County Public Service Authority (BCPSA) owns and operates a huge water distribution system in far southwest Virginia.

Major components of the BCPSA water system include:

  • 450 miles of water line
  • Service to 7,733 customers
  • 79 pumping stations and 66 water storage tanks

The BCPSA commissioned T&L to study and design solutions to provide a reliable and long-term water transmission system for its vast system. Working in partnership with the BCPSA, T&L designed numerous improvements to the system, some of which include:

 

  • Replacement of the 16-inch AC water transmission main with 18-inch ductile iron with double layer polyethylene wrap for corrosion protection
  • Installation of two (2) new 4,000 gpm pumping stations each equipped with three (3) 250 HP pumps
  • Installation of 750 Kw emergency generators in each pumping station
  • Other measures such as hydraulic surge control, Variable Frequency Drives for control of flow, etc.Thanks to the Virginia Department of Health (VDH), a funding package of $13 million was provided, which is the largest VDH-funded project ever in the State of Virginia.

    The project was divided into three (3) construction contracts, all of which are substantially complete and under budget. The final total project cost is projected at $12.6 million.

Photos

Client:
Buchanan County Public Service Authority

Service Type:
Civil Engineering 

Project Value:
$12.6 Million

Completion Date:
2013

Project Area:
450 Miles of water line
79 Pump stations
66 Water storage tanks

Baptist Valley Sewer

Baptist Valley Sewer

Baptist Valley Sewer

The professional engineering services of Thompson & Litton were utilized by the Tazewell County Public Service Authority in central Tazewell County, Virginia on the Baptist Valley Phase I (East) Sewer Project.

The project was a massive undertaking initiated by the County and funded through a variety of resources. The project extends west from the Town of Tazewell along State Route 631 to the intersection of State Routes 631 and 16, Route 635, Adria, Stoney Ridge and a portion of State Route 645.

T&L provided comprehensive planning, surveying, design, permitting, bidding and construction administration services for:

  • The extension of more than 72,000 LF of gravity sewer;
  • 1,500 LF of force main;
  • Multiple pump stations; and
  • All related appurtenances

Service was provided to approximately 945 residential and 10 commercial connections. This area has previously had no access to a public sewerage system and has in the past primarily utilized privately owned and maintained on-site septic systems.

Funding for the Baptist Valley East Sewer Line Extension was provided by grants from the Department of Environmental Quality, the Department of Housing and Community Development and by the Southern Rivers Watershed Enhancement Program.

The $10.1 Million was completed in July 2011.

Photos

Client:
Tazewell County Public Service Authority

Service Type:
Civil Engineering 

Project Value:
$10.1 Million

Completion Date:
July 2011

Project Area:
72,000 LF of gravity sewer
1,500 LF of force main

Town of Alderson, WV – Water Project Experience

Town of Alderson, WV – Water Project Experience

Town of Alderson, WV Water Project Experience

Location: Greenbrier and Monroe Counties, West Virginia

Project: Miscellaneous Consulting Services related to water treatment plant operation.
Est. Cost: Local funding
Status: On-going

Project: Comprehensive Water Treatment Plant and Distribution System Report and Study.
Status: Report Complete

Project: Phase I
Feasibility study, design, construction administration and inspection of two water storage facilities, raw water intake, 350-gpm facility and distribution system.
Est. Cost: $900,000
Status: Completed

Project: Phase II
Study Design, construction and inspection of water treatment plant expansion including presedimentation basin, raw water intake, and above ground storage.
Est. Cost: $1,000,000
Status: Completed January 1991

Photos

Client:
Town of Alderson, WV

Service Type:
Civil Engineering 

Project Value:
N/A

Completion Date:
N/A

Project Area:
N/A

West Virginia Sanitary Experience – Wastewater

West Virginia Sanitary Experience – Wastewater

West Virginia Sanitary Experience – Wastewater

Client:             City of Welch, West Virginia Sanitary Board

Location:        Welch, West Virginia

Project:           Complete Design and Construction period services for a wastewater collection system extension to serve the Tom’s Mountain area.

Est. Cost         $1,300,000

Status:            Complete

                                                                                                                                                                       

Client:        City of Welch, West Virginia Sanitary Board

Location:        Welch, West Virginia

Project:           Complete Design and Construction period services for new wastewater collection system and treatment plant for city and surrounding areas to achieve compliance with Federal Consent Decree.

Est. Cost         Phase I ‑ $13,100,000

Status:             Operational 1998

Est. Cost:        Phase II ‑ $8,000,000

                                                                                                                                                                       

Client:           Oakvale Road Public Service District

Location:        Gardner, West Virginia

Project:           Complete Design and Construction period services for new wastewater collection system to serve the Gardner Road area of Mercer County.

Est. Cost:        $1,259,000

Status:            Complete

                                                                                                                                                                       

Client:            Center Public Service District

Location:        Wyoming County, West Virginia

Project:           Wastewater Plant Improvements including new decanters and UV disinfection system.

Est. Cost:        $300,000

Status:           Complete

                                                                                                                                                                                   

Client:           Big Bend Public Service District

Location:        Summers County, West Virginia

Project:           Planning, design and construction administration for 10,000 gpd extended aeration plant and related sewers serving the Pence Springs Hotel and Restaurant.

Est. Cost:        $150,000

Status:            Complete

                                                                                                                                                                                   

Client:    Big Bend Public Service District

Location:        Summers County, West Virginia

Project:           Planning, design and construction administration for 20,000 gpd extended aeration plant and related sewers serving the Pine Hill Subdivision.

Est. Cost:        $300,000

Status:          Complete

                                                                                                                                                                                   

Client:            City of Hinton

Location:        Summers County, West Virginia

Project:           Sandstone Sewer System.  Includes gravity sewer system and new wastewater treatment plant to serve the Sandstone community and National Park Service Visitor Center.

Est. Cost:        $1,400,000

Status:             Complete

                                                                                                                                                                       

Client:             Bramwell Public Service District

Location:        Mercer County, West Virginia

Project:           Wastewater Collection/Treatment Facilities                  

‑           Collection System including gravity, vacuum and pressure sewers

‑           Aeration System

‑           Clarifiers

  • Control Building/Disinfection
  • Project objectives of meeting compliance with State of West Virginia Consent Decree

Est. Cost:        $4,300,000

Status:             Complete

                                                                                                                                                                       

 Client:            City of Princeton

Location:        Mercer County, West Virginia

Project:           Phase I – Upgrade of wastewater treatment plant, including new clarifiers, solids handling and treatment units.

                         Phase II – Expansion of wastewater treatment plant.

Est. Cost:        $1,200 ,000 – Phase I

                          $7,000,000 – Phase II

 

                                                                                                                                                                       

Client:              City of Bluefield

Location:        Mercer County, West Virginia

Project:           New collection lines, force mains and pump stations along John Nash Boulevard and I-77, to serve area east of Bluefield.  General engineering services for wastewater and stormwater systems.

Est. Cost:        Phase I – $350,000

                          Phase II – $1,200,000

Status:           Phase 1 – Complete

                        Phase II – Planning complete

                                                                                                                                                                       

Client:            Logan County Public Service District

Location:        Logan, West Virginia

Project:           Phase II-A wastewater collection system project for communities of West Logan and Hedgeview.

Est. Cost         $7,300,000

                                                                                                                                                                       

Client:               Mercer County Commission

Location:        Mercer County, West Virginia

Project:           Comprehensive countywide sewer study for expansion and upgrade of wastewater facilities.

Est. Cost         Not applicable

Status:          Complete

                                                                                                                                                                       

Client:             Town of Matoaka

Location:        Matoaka, West Virginia

Project:           Treatment Plant Improvements, sewer extension and sewer rehabilitation.

Cost:              $700,000

Status:          Complete

                                                                                                                                                                       

Client:            Town of Athens

Location:        Mercer County, West Virginia

Project:           Phase I and II 500,000 gallon per day sequencing batch reactor wastewater plant and associated collection lines to achieve compliance with State of West Virginia Consent Decree.

Est. Cost:        $3,800,000

Status:             Phase I Complete

                                                                                                                                                                       

Client:             City of Hinton

Location:        Summers County, West Virginia

Project:           Gravity sewer, pumping station, and force main crossing the New River serving Brooklin community.

Est. Cost:        $1,200,000

Status:             Complete

                                                                                                                                                                       

Client:             City of Hinton

Location:        Summers County, West Virginia

Project:           Brooks / Barksdale sewer. Includes gravity sewer, two pumping stations and treatment plant headworks.

Est. Cost:        $3,300,000

                                                                                                                                                                       

Client:            Town of Alderson

Location:        Greenbrier and Monroe Counties, West Virginia

Project:           Phases I and II – 400,000 gallon per day sewage treatment plant and approximately 11 miles of sewage collection system.

Est. Cost:        Phases I and II – $3,500,000

Status:            Phase I – Begin 1976 – Operational 1980

                        Phase II – Began 1982 – Operational 1995

Project:          Phase III ‑ Solids handling system with Belt Filter Press, Aerobic Digester and appurtenances.

Est. Cost:        Phase III – $1,300,000

Status:            Operational 1999

                                                                                                                                                                       

Client:            City of Summersville

Location:        Summersville, Nicholas County, West Virginia

Project:           U.S. Route 19 Economic Development Center Upgrading, Study Design, Construction Administration, and Inspection of Water Storage Facilities, Distribution Lines, Wastewater Treatment Plant Upgrading and Collection System

Est. Cost:        $3,200,000

Status:             Complete

                                                                                                                                                                       

Client:            Development Authority of Mercer County

Location:        Mercer County, West Virginia

Project:           Feasibility study and design of an industrial park complex including:

‑           50,000‑gallon per day sewage treatment and collection system

‑           Water storage and distribution

‑           Roads

Est. Cost:        $2,500,000

Status:           Begin 1978 ‑ Operational 1981

                                                                                                                                                                       

Client:           White Oak Public Service District

Location:        Fayette County, West Virginia

Project:           Wastewater Treatment Facilities Improvements                  

‑           Grit Chamber

‑           Aeration System Modifications

‑           Clarifier

‑           Chlorination/Dechlorination Contact Tank and Facilities    

‑           Control Building

‑           Maintenance Building

‑           Post Aeration

 

Est. Cost:        $762,000

Status:          Complete

                                                                                                                                                                       

Client:         Danville Public Service District

Location:        Boone County, West Virginia

Project:           550,000 Gallons Per Day Wastewater Treatment Facility

‑           Grit Chamber

‑           Bar Screen

‑           Aeration System

‑           Clarifiers

‑           Control Building

‑           Solid Handling System

‑           Collection System

‑           Lift Stations

Est. Cost:        $8,000,000

Status:            Complete

                                                                                                                                                                       

Client:
Various Clients

Service Type:
Civil Engineering

Project Value:
N/A

Completion Date:
N/A