West Virginia Bridge Experience
Client: West Virginia Division of Highways
Location: Near Welch, McDowell County, West Virginia
Project: Design and preparation of contract plans for 5.75 miles of the four lane Coalfields Expressway. Includes two bridges. Indian Gap Bridge, three span welded plate girder with a total length of 220’. North Welch Bridge, five span welded plate girder with a total length of 1,570’ and pier heights reaching 410’. Two access roads provided for access from Welch and from U.S. Route 52.
Est. Cost: $150,000,000 Design Completed – Ongoing Construction Completed – N/A
Location: Near Northfork, McDowell County, West Virginia
Project: Design and preparation of contract plans for the Rolfe Bridge over the North Fork of Elkhorn Creek. Single span welded plate girders. Total length 70’.
Cost: $900,000 Design Completed 2006 Construction Completed – 2008
Location: Near Matewan, Mingo County, West Virginia
Project: Design and preparation of contract plans for Grapevine Creek Bridge over Grapevine Creek. Single span welded plate girders. Total length 70’. 2003 DoH Engineering Excellence Award, Small Roadway winner.
Cost: $861,000 Design Completed 2003 Construction Completed – 2006
Location: Gilboa, Nicholas County, West Virginia
Project: Design and preparation of contract plans for the Hutchinson Branch Bridge over Buck Garden Creek. Single span rolled beam. Total length 45’. Roadway portion required over 33,000 c.y. of cut.
Cost: $1,221,150 Design Completed 2004 Construction Completed – 2006
Location: Hinton, Summers County, West Virginia
Project: Design and preparation of contract plans for Wiggins Bridge over the Greenbrier River. Three span continuous curved welded plate girders. Hybrid girders with Gr. 70 steel used. Pile supported abutments and spread footing at piers. Total length 388’.
Cost: $1,414,250 Design Completed 2003 Construction Completed 2004
Location: Mullens, Wyoming County, West Virginia
Project: Design and preparation of contract plans for the Mullens Bridge over the Norfolk Southern Railroad. Three span continuous curved welded plate girder. Hybrid girders with Gr. 70 steel used. Total length 258’.
Cost: $1,293,800 Design Completed 2002 Construction Completed 2004
Location: Adrian, Upshur County, West Virginia
Project: Design and preparation of contract plans for Gould Bridge over French Creek. Three span continuous rolled beams. Pile supported foundation. Total length 223’.
Cost: $611,300 Design Completed 2002 Construction Completed 2003
Location: Cass, Pocahontas County, West Virginia
Project: Design and preparation of contact plans for the Cass Arch Bridge over the Greenbrier River. This two span continuous hybrid welded plate girder utilizes both Gr. 50W and 70W steel. Ballusters are provided on the parapets as this bridge is located near the historic Cass Scenic Railroad State Park. 2007 DoH Engineering Excellence Award, Small Bridge winner.
Est. Cost: $970,000 Design Completed 2008 Construction Completed 2010
Location: Mineral Wells, Wood County, West Virginia
Project: Design and preparation of contract plans for Mineral Wells Interchange Overpass Bridge over I-77. Two span continuous welded plate girders. Bridge carries six lanes over the interstate and supports one overhead sign structure. All foundations pile supported. Total length 210 feet.
Cost: $3,570,000 Design Completed 1999 Construction Completed 2000
Location: Parkersburg, Wood County, West Virginia
Project: Design and preparation of contract plans for I-77 Interchange Bridge over Camden Avenue. Three span continuous rolled beams. Existing piers connected and superstructure widened to accommodate I-77 widening to six lanes. All foundations pile supported. Total length 145 feet.
Est. Cost: $1,000,000 Design Completed 2003 Construction Completed 2011
Location: Avondale, McDowell County, West Virginia
Project: Design and preparation of contract plans for Iaeger-Bradshaw Middle School Bridge over Dry Fork. Two span continuous rolled beams. Pier supported on drilled shafts. Total length 50 m.
Cost: $650,500 Design Completed 1998 Construction Completed 2000
Location: Spanishburg, Mercer County, West Virginia
Project: Design and preparation of contract plans for Gardner Truss Bridge over the Bluestone River. One of first metric design projects in state and one of the first to utilize integral abutments supported by piles. Total length 50 m.
Cost: $750,000 Design Completed 1996 Construction Completed 1998
Location: Bowles, Lincoln County, West Virginia
Project: Design and preparation of contract plans for Bowles Bridge over Trace Fork. Three span continuous rolled beams. Existing pier shafts utilized with new caps poured. Total length 171 feet.
Cost: $700,000 Design Completed 1994 Construction Completed 1996
Location: Martinsburg, Berkeley County, West Virginia
Project: Design and preparation of contract plans for Tabbs Station Bridge over the CSX Railroad. Single 128 feet span prefabricated through truss. Counterfort abutments and wingwalls at each end.
Cost: $1,900,000 Design Completed 1993 Construction Completed 1995
Location: Champwood, Mineral County, West Virginia
Project: Design and preparation of contract plans for Patterson Creek Bridge over Patterson Cr. Three span continuous rolled beams. Total length 216 feet.
Cost: $792,000 Design Completed 1993 Construction Completed 1995
Location: Huntersville, Pocahontas County, West Virginia
Project: Design and preparation of contract plans for the Devils Backbone Bridge over Knapp Creek. Three span continuous rolled beams. Utilized existing piers. Total length 236 feet.
Cost: $983,000 Design Completed 1993 Construction Completed 1995
Location: Reeses Mill, Mineral County, West Virginia
Project: Design and preparation of contract plans for Reeses Mill Bridge over Patterson Creek. Three span continuous rolled beams. Total length 164 feet.
Cost: $750,000 Design Completed 1992 Construction Completed 1994
Location: Cassity, Randolph County, West Virginia
Project: Design and preparation of contract plans for Cassity Bridge over Cassity Fork. Single 58-ft. span precast concrete box beams.
Cost: $305,000 Design Completed 1992 Construction Completed 1993
Location: Buckhannon, Upshur County, West Virginia
Project: Design and preparation of contract plans for the Buckhannon Truss Bridge over the Buckhannon River. Two span continuous welded plate girders. Counterfort abutment and wingwall at one end. Total length 147 feet.
Cost: $1,220,000 Design Completed 1991 Construction Completed 1994
Location: Henlawson, Logan County, West Virginia
Project: Design and preparation of contract plans for replacement of the Buffalo Creek Bridge with a 2‑cell box culvert. Widened to include turn lane for Chief Logan State Park.
Cost: $1,200,000 Design Completed 1991 Construction Completed 1993
Location: Pax, Fayette County, West Virginia
Project: Design and preparation of contract plans for Pax Bridge over Paint Creek. Two span continuous rolled beams. Total length 100 feet.
Cost: $748,000 Design Completed 1989 Construction Completed 1991
Location: Welch, McDowell County, West Virginia
Project: Design and preparation of contract plans for the Welch Post Office Bridge over the Elkhorn Creek. Single 80 feet span welded plate girders. Structure ties to existing Post Office parking lot.
Cost: $750,000 Design Completed 1988 Construction Completed 1991
Location: Poca, Putnam County, West Virginia
Project: Design and preparation of contract plans for the Poca Bridge over the Pocatalico River. Two span continuous welded plate girder. Total length 200 feet.
Cost: $1,723,000 Design Completed 1987 Construction Completed 1990
Location: Rock, Mercer County, West Virginia
Project: Design and preparation of contract plans for the Rock Truss Bridge over the Bluestone River. Three span continuous rolled beams. Total length 180 feet.
Cost: $881,000 Design Completed 1987 Construction Completed 1990
Location: Artie, Raleigh County, West Virginia
Project: Design and preparation of contract plans for the Artie Post Office Bridge over the Clear Fork. Single 48-ft. span rolled beam.
Cost: $300,000 Design Completed 1987 Construction Completed 1989
Location: Agnew, Fayette County, West Virginia
Project: Design and preparation of contract plans for the Rich Creek Bridge over the Rich Creek. Single 40-ft. span precast concrete box beams.
Cost: $290,000 Design Completed 1987 Construction Completed 1989
Location: Brooklin, Summers County, West Virginia
Project: Design and preparation of contract plans for the Madam Creek Bridge over Madam Creek. Single 43-ft. span rolled beams.
Cost: $260,000 Design Completed 1986 Construction Completed 1988
Location: Vallscreek, McDowell County, West Virginia
Project: Design and preparation of contract plans for the Vallscreek Bridge over the Dry Fork. Two span continuous rolled beams. Total length 100 feet.
Cost: $300,000 Design Completed 1986 Construction Completed 1988
Location: Canebrake, McDowell County, West Virginia
Project: Design and preparation of contract plans for the Canebrake Bridge over the Dry Fork. Two span continuous rolled beams. Total length 100 feet.
Cost: $350,000 Design Completed 1986 Construction Completed 1988
Location: Garrison, Boone County, West Virginia
Project: Design and preparation of contract plans for the Seng Creek Bridge over the Seng Creek. Single 36-ft. span rolled beams.
Cost: $150,000 Design Completed 1986 Construction Completed 1988
Location: Pine Knob, Raleigh County, West Virginia
Project: Design and preparation of contract plans for the Peachtree Creek Bridge over Peachtree Creek. Single 35-ft. span rolled beams.
Cost: $150,000 Design Completed 1986 Construction Completed 1988
Location: Pettus, Raleigh County, West Virginia
Project: Design and preparation of contract plans for deck replacement and widening on the Little Marsh Fork Bridge. Existing substructure utilized with new backwalls and pier caps installed. Total structure length 115 feet.
Est. Cost: $300,000 Design Completed 2000 Construction Completed 2001
Client:
Various Clients
Service Type:
Transportation
Project Value:
N/A
Completion Date:
N/A