Virginia Tech Marching Virginians Practice Field and Facility

Under an active Term Contract, T&L designed a new practice field and facility for the Marching Virginians.

T&L’s services included Architecture, MEP, Structural and civil engineering.

As part of the site/civil engineering scope of this project, T&L provided design services for the following:

  • A hydrologic and hydraulic analysis of the existing open and closed stormwater collection systems and water quality BMPs over an area of approximately 60 acres;
  • New stormwater management systems, including water quantity and water quality BMPs were designed to accommodate the new facilities and rectify inadequacies of the existing stormwater management systems;
  • New 100,800 SF (80 yards by 140 yards) artificial turf field for shared use by the band and Recreational Sports department
    for soccer and similar sports;
  • 100,000 SF extended detention basin designed to accommodate future improvements;
  • Routes to accommodate emergency vehicles, pedestrians, and accessibility; and
  • Utilities (potable water, storm sewer, sanitary sewer, electric service and fiber optic cable).

 

Photos

Client:
Virginia Tech

Service Type:
Civil Engineering

Project Value:
$3.78 Million

Completion Date:
June 2015

Project Area:
100,000 SF detention basin 
100,800 SF artificial turf field