Unicoi Middle School – Erwin, TN

Unicoi Middle School – Erwin, TN

Unicoi Middle School

A new middle school for Unicoi County Schools was required in order to move the eighth grade out of the high school and to relieve crowding at the elementary schools. BLS T&L programmed and designed the new school with respect to an adjacent residential neighborhood. The final design provides an appropriate sense of scale in relationship to nearby homes.

The 800 student school contains a pre-school component of five classrooms, an 800 seat gymnasium, art room, band room, chorus room, science and computer labs. The academic areas of the school are accessible to common use areas, with a gymnasium that can be utilized in the evenings after regular school hours. The building was designed to be durable, maintainable and energy efficient. BLS  T&L provided contract administration on the project, and worked closely with the owner and contractor on scheduling, to insure that the project stayed on schedule and in budget.

 

Client:
Unicoi County Schools

Service Type:
Architecture

Project Value:
$14,081,000 

Completion Date:
2010

Project Area:
102,480 sf

Indian Trail Middle School – Johnson City, TN

Indian Trail Middle School – Johnson City, TN

Indian Trail Middle School

The challenge was to combine traditional values with the latest technological capabilities. The complex is wired from the ground up with cutting edge technology that students will learn with and use in the workplace of the 21st Century. The overall design of the structure is reminiscent of schools designed by BLS T&L (formerly Beeson, Lusk & Street, Architect’s) and built in the early 20th Century in Johnson City. The light tower at the center of the entry, and an additional five skylights, provide natural light into the structure. The building structures and site were master planned to accommodate phased construction. Indian Trail Middle School was constructed by utilizing a separate sitework package, initial building package and food service equipment package. An auditorium and classroom addition were constructed in a later phase. This project required the coordination expertise of  the architects and their ability to work with multiple contractors and schedules.

Client:
Johnson City School Board

Service Type:
Architecture

Project Value:
$14,735,000

Completion Date:
1998

Project Area:
163,720 sf

West Virginia Bridge Experience

West Virginia Bridge Experience

West Virginia Bridge Experience

Client:             West Virginia Division of Highways

                                                                                                                                                                       

Location:        Near Welch, McDowell County, West Virginia

Project:           Design and preparation of contract plans for 5.75 miles of the four lane Coalfields Expressway.  Includes two bridges.  Indian Gap Bridge, three span welded plate girder with a total length of 220’.  North Welch Bridge, five span welded plate girder with a total length of 1,570’ and pier heights reaching 410’. Two access roads provided for access from Welch and from U.S. Route 52.

Est. Cost:        $150,000,000       Design Completed – Ongoing               Construction Completed – N/A

                                                                                                                                                                       

Location:        Near Northfork, McDowell County, West Virginia

Project:           Design and preparation of contract plans for the Rolfe Bridge over the North Fork of Elkhorn Creek.  Single span welded plate girders.  Total length 70’.

Cost:               $900,000              Design Completed 2006                      Construction Completed – 2008

                                                                                                                                                                       

Location:        Near Matewan, Mingo County, West Virginia

Project:           Design and preparation of contract plans for Grapevine Creek Bridge over Grapevine Creek.  Single span welded plate girders.  Total length 70’.  2003 DoH Engineering Excellence Award, Small Roadway winner.

 Cost:               $861,000              Design Completed 2003                      Construction Completed – 2006

                                                                                                                                                                       

Location:        Gilboa, Nicholas County, West Virginia

Project:           Design and preparation of contract plans for the Hutchinson Branch Bridge over Buck Garden Creek.  Single span rolled beam.  Total length 45’.  Roadway portion required over 33,000 c.y. of cut.

Cost:               $1,221,150           Design Completed 2004                      Construction Completed – 2006

                                                                                                                                                                       

Location:        Hinton, Summers County, West Virginia

Project:           Design and preparation of contract plans for Wiggins Bridge over the Greenbrier River.  Three span continuous curved welded plate girders.  Hybrid girders with Gr. 70 steel used.  Pile supported abutments and spread footing at piers.   Total length 388’.

Cost:               $1,414,250           Design Completed 2003                      Construction Completed 2004

                                                                                                                                                                       

Location:        Mullens, Wyoming County, West Virginia

Project:           Design and preparation of contract plans for the Mullens Bridge over the Norfolk Southern Railroad.  Three span continuous curved welded plate girder.  Hybrid girders with Gr. 70 steel used.  Total length 258’.

Cost:               $1,293,800           Design Completed 2002                      Construction Completed 2004

                                                                                                                                                                       

Location:        Adrian, Upshur County, West Virginia

Project:           Design and preparation of contract plans for Gould Bridge over French Creek.  Three span continuous rolled beams.  Pile supported foundation.  Total length 223’.

Cost:               $611,300              Design Completed 2002                      Construction Completed 2003

                                                                                                                                                                       

Location:        Cass, Pocahontas County, West Virginia

Project:           Design and preparation of contact plans for the Cass Arch Bridge over the Greenbrier River.  This two span continuous hybrid welded plate girder utilizes both Gr. 50W and 70W steel.  Ballusters are provided on the parapets as this bridge is located near the historic Cass Scenic Railroad State Park.  2007 DoH Engineering Excellence Award, Small Bridge winner.

Est. Cost:        $970,000              Design Completed 2008                      Construction Completed 2010

                                                                                                                                                                       

Location:        Mineral Wells, Wood County, West Virginia

Project:           Design and preparation of contract plans for Mineral Wells Interchange Overpass Bridge over I-77.  Two span continuous welded plate girders.  Bridge carries six lanes over the interstate and supports one overhead sign structure.  All foundations pile supported.  Total length 210 feet.

Cost:   $3,570,000                       Design Completed 1999                      Construction Completed 2000

                                                                                                                                                                       

Location:        Parkersburg, Wood County, West Virginia

Project:           Design and preparation of contract plans for I-77 Interchange Bridge over Camden Avenue.  Three span continuous rolled beams.  Existing piers connected and superstructure widened to accommodate I-77 widening to six lanes. All foundations pile supported. Total length 145 feet.

Est. Cost:        $1,000,000           Design Completed 2003                      Construction Completed 2011

                                                                                                                                                                       

Location:        Avondale, McDowell County, West Virginia

Project:           Design and preparation of contract plans for Iaeger-Bradshaw Middle School Bridge over Dry Fork.  Two span continuous rolled beams.  Pier supported on drilled shafts. Total length 50 m.

Cost:   $650,500                          Design Completed 1998                      Construction Completed 2000

                                                                                                                                                                       

Location:        Spanishburg, Mercer County, West Virginia

Project:           Design and preparation of contract plans for Gardner Truss Bridge over the Bluestone River.  One of first metric design projects in state and one of the first to utilize integral abutments supported by piles.  Total length 50 m.

Cost:   $750,000                          Design Completed 1996                      Construction Completed 1998

                                                                                                                                                                       

Location:        Bowles, Lincoln County, West Virginia

Project:           Design and preparation of contract plans for Bowles Bridge over Trace Fork.  Three span continuous rolled beams.  Existing pier shafts utilized with new caps poured.  Total length 171 feet.

Cost:               $700,000              Design Completed 1994                      Construction Completed 1996

                                                                                                                                                                       

Location:        Martinsburg, Berkeley County, West Virginia

Project:           Design and preparation of contract plans for Tabbs Station Bridge over the CSX Railroad.  Single 128 feet span prefabricated through truss.  Counterfort abutments and wingwalls at each end.

Cost:               $1,900,000           Design Completed 1993                      Construction Completed 1995

                                                                                                                                                                       

Location:        Champwood, Mineral County, West Virginia

Project:           Design and preparation of contract plans for Patterson Creek Bridge over Patterson Cr.  Three span continuous rolled beams.  Total length 216 feet.

Cost:               $792,000              Design Completed 1993                      Construction Completed 1995

                                                                                                                                                                       

Location:        Huntersville, Pocahontas County, West Virginia

Project:           Design and preparation of contract plans for the Devils Backbone Bridge over Knapp Creek.  Three span continuous rolled beams.  Utilized existing piers.  Total length 236 feet.

Cost:   $983,000                          Design Completed 1993                      Construction Completed 1995

                                                                                                                                                                       

Location:        Reeses Mill, Mineral County, West Virginia

Project:           Design and preparation of contract plans for Reeses Mill Bridge over Patterson Creek.  Three span continuous rolled beams.  Total length 164 feet.

Cost:               $750,000              Design Completed 1992                      Construction Completed 1994

                                                                                                                                                                       

 Location:        Cassity, Randolph County, West Virginia

Project:           Design and preparation of contract plans for Cassity Bridge over Cassity Fork.  Single 58-ft. span precast concrete box beams.

Cost:   $305,000                          Design Completed 1992                      Construction Completed 1993

                                                                                                                                                                       

Location:        Buckhannon, Upshur County, West Virginia

Project:           Design and preparation of contract plans for the Buckhannon Truss Bridge over the Buckhannon River.  Two span continuous welded plate girders.  Counterfort abutment and wingwall at one end.  Total length 147 feet.

Cost:               $1,220,000           Design Completed 1991                      Construction Completed 1994

                                                                                                                                                           

Location:        Henlawson, Logan County, West Virginia

Project:           Design and preparation of contract plans for replacement of the Buffalo Creek Bridge with a 2‑cell box culvert.  Widened to include turn lane for Chief Logan State Park.

 Cost:               $1,200,000           Design Completed 1991                      Construction Completed 1993

                                                                                                                                                                       

Location:        Pax, Fayette County, West Virginia

Project:           Design and preparation of contract plans for Pax Bridge over Paint Creek.  Two span continuous rolled beams.  Total length 100 feet.

Cost:               $748,000              Design Completed 1989                      Construction Completed 1991

                                                                                                                                                                       

Location:        Welch, McDowell County, West Virginia

Project:           Design and preparation of contract plans for the Welch Post Office Bridge over the Elkhorn Creek.  Single 80 feet span welded plate girders.  Structure ties to existing Post Office parking lot.

Cost:   $750,000                          Design Completed 1988                      Construction Completed 1991

                                                                                                                                                                       

Location:        Poca, Putnam County, West Virginia

Project:           Design and preparation of contract plans for the Poca Bridge over the Pocatalico River.  Two span continuous welded plate girder.  Total length 200 feet.

Cost:               $1,723,000           Design Completed 1987                      Construction Completed 1990

                                                                                                                                                                       

Location:        Rock, Mercer County, West Virginia

Project:           Design and preparation of contract plans for the Rock Truss Bridge over the Bluestone River.  Three span continuous rolled beams.  Total length 180 feet.

Cost:   $881,000                          Design Completed 1987                      Construction Completed 1990

                                                                                                                                                                       

Location:        Artie, Raleigh County, West Virginia

Project:           Design and preparation of contract plans for the Artie Post Office Bridge over the Clear Fork.  Single 48-ft. span rolled beam.

Cost:   $300,000                          Design Completed 1987                      Construction Completed 1989

                                                                                                                                                                       

Location:        Agnew, Fayette County, West Virginia

Project:           Design and preparation of contract plans for the Rich Creek Bridge over the Rich Creek.  Single 40-ft. span precast concrete box beams.

Cost:   $290,000                          Design Completed 1987                      Construction Completed 1989

                                                                                                                                                                       

Location:        Brooklin, Summers County, West Virginia

Project:           Design and preparation of contract plans for the Madam Creek Bridge over Madam Creek.  Single 43-ft. span rolled beams.

Cost:               $260,000              Design Completed 1986                      Construction Completed 1988

                                                                                                                                                                       

Location:        Vallscreek, McDowell County, West Virginia

Project:           Design and preparation of contract plans for the Vallscreek Bridge over the Dry Fork. Two span continuous rolled beams.  Total length 100 feet.

Cost:   $300,000                          Design Completed 1986                      Construction Completed 1988

                                                                                                                                                                       

Location:        Canebrake, McDowell County, West Virginia  

Project:           Design and preparation of contract plans for the Canebrake Bridge over the Dry Fork. Two span continuous rolled beams.  Total length 100 feet.

Cost:   $350,000                          Design Completed 1986                      Construction Completed 1988

                                                                                                                                                                       

Location:        Garrison, Boone County, West Virginia

Project:           Design and preparation of contract plans for the Seng Creek Bridge over the Seng Creek.  Single 36-ft. span rolled beams.

Cost:               $150,000              Design Completed 1986                      Construction Completed 1988

                                                                                                                                                                       

Location:        Pine Knob, Raleigh County, West Virginia

Project:           Design and preparation of contract plans for the Peachtree Creek Bridge over Peachtree Creek.  Single 35-ft. span rolled beams.

Cost:   $150,000                          Design Completed 1986                      Construction Completed 1988

                                                                                                                                                                       

Location:        Pettus, Raleigh County, West Virginia

Project:           Design and preparation of contract plans for deck replacement and widening on the Little Marsh Fork Bridge.  Existing substructure utilized with new backwalls and pier caps installed. Total structure length 115 feet.

Est. Cost:        $300,000              Design Completed 2000                      Construction Completed 2001

                                                                                                                                                                       

 

Client:
Various Clients

Service Type:
Transportation

Project Value:
N/A

Completion Date:
N/A

 

Oakvale Road PSD Water Project Experience

Oakvale Road PSD Water Project Experience

Oakvale Road PSD Water Project Experience

Location: Mercer County, West Virginia

Project: I 77/U.S. Route 460 Economic Development Project Study, Design Construction Administration and Inspection
150,000 gallon water storage tank
Distribution lines to serve private industrial development and tourist center with booster station system to be operated by WV American Water Company
Est. Cost: $1,300,000
Status: Complete

Project: Mercer/Summers Phase IV-A Waterline Extensions – Over 25 miles of 2” through 12” waterlines with appurtenances, pressure reducing stations, booster station and water storage tank. Service to 407 new customers
Est. Cost: $6.4 Million
Status: Completed 2012

Project: Mercer/Summers Phase IV-B Waterline Extension – 13 miles of 2” through 10” waterlines with appurtenances, pressure reducing and booster stations and water storage tank. Service to 128 new customers
Est. Cost: $2.6 Million
Status: Partial Substantial Completion Achieved

Photos

Client:
Oakvale Road PSD

Service Type:
Civil Engineering 

Project Value:
N/A

Completion Date:
N/A

Project Area:
N/A

Town of Rainelle, WV Water Project Experience

Town of Rainelle, WV Water Project Experience

Town of Rainelle, WV Water Project Experience

Location: Greenbrier County, West Virginia

Project: Design and Construction period services for water system and treatment plant renovations. Extension & replacement of 2.3 miles of 2” – 8” waterlines and appurtenances, 160 existing customer meter reconnects, 8 new customer services, design of existing plant upgrades with aerator, one four-cell horizontal pressure filter, and one pressure detention tank.
Est. Cost: $2,675,000
Status: Completed March 2016

Project: Design, construction administration and inspection for water system renovation.
150,000 gallon storage tank
4,500 feet of distribution lines
Est. Cost: $240,000
Status: Begin -1985 Operational 1986

Photos

Client:
Town of Rainelle, WV

Service Type:
Civil Engineering 

Project Value:
N/A

Completion Date:
N/A

Project Area:
N/A