Big Bend PSD – Water Project Experience
Location: Summers County, West Virginia
Project: Ballagee, Barger Springs, Forest Hill, Wiggins and Browning Water Distribution System Extension
8”, 6” and smaller water distribution lines
four water storage tanks
two lift stations
Est. Cost: $6,000,000
Status: Preliminary Engineering Report Complete
Project: Feasibility Study, Design, Construction Administration and Inspection
Phase I
Two 100,000 gallon water storage tanks
11 miles of distribution lines
200-gpm water treatment facility for surface water Greenbrier River Raw Water Intake
Est. Cost: $1,300,000
Status: Began 1977 Operational 1980
Project: Phase II
2 miles of distribution lines
25,000 gallons per day package wastewater treatment plant, Lift Station
Est. Cost: $700,000
Status: Operational 1989
Project: Phase III
2 miles of distribution lines and one river crossing
Est. Cost: $450,000
Status: Operational 1993
Project: Phase IV
1.5 miles of distribution lines
Est. Cost: $240,000
Status: Project in Design Phase
Project: Willowwood Waterline Extension
Two miles of Water Distribution System
Est. Cost: $210,000
Status: Operational 1998