Town of Bedford Stoney Creek Dam
T&L was retained by the Town of Bedford (formerly City of Bedford) to investigate and make recommendations regarding spillway and other repairs to the Stoney Creek Dam. Following the development of a Flood Inundation Study, Preliminary Engineering Report, and Geotechnical Analysis, it was determined that certain improvements to the Dam were required.
These improvements included:
- Repairs on the existing Dam spillway; and
- Construction of an auxiliary spillway to increase capacity
These improvements were addressed by the design and construction of several improvements which involved:
- Structural repairs to the concrete chute spillway;
- Structural concrete chute walls to contain spillway flows; and
- A roller compacted concrete auxiliary spillway to bring the total spillway capacity up to the probable maximum flood flow requirements.
Client:
Town of Bedford
Service Type:
Civil Engineering
Project Value:
$5.34 Million
Completion Date:
2012