Roanoke Valley Broadband Authority
T&L was selected by the Roanoke Valley Broadband Authority (RVBA) in 2014 for Phase I and Phase II Fiber Optic Network design, including permitting and easement work throughout Roanoke County and the Cities of Salem & Roanoke, Virginia.
Highlights of the Phase I project included:
- RVBA Phase I (NTP = 7/13/15; Completed 8/19/16) (Total Construction Cost = $4.1 Million)
- Outside Plant (OSP) design & permitting
- Designed 49 miles of buried 144 count fiber in 4-way Future Path conduit
- Prepared network fiber utilization map and splicing diagrams
- Designed 47 FTTx drops
- Designed 2 miles of aerial 144 count fiber
- Obtained following permits
*VDOT Land Use Permit (LUP)
*VMRC stream crossing permits
*N-S railroad crossing permits - Provided bidding and construction phase services
Highlights of the Phase II project included:
- RVBA Phase II (NTP = 2/8/17; Completed 8/21/17) (Total Construction Cost = $2.7 Million)
- Outside Plant (OSP) design and permitting
- 36 miles of buried 144 count fiber in 4-way FuturePath conduit
- Obtained following permits
*VDOT Land Use Permit (LUP)
*VMRC stream crossing permits
*N-S railroad crossing permits - Provided consultation services associated with 36 miles of buried (bore and microtrenching), aerial, and bridge attachment fiber optic cable installation
- Updated network fiber utilization map and splicing diagrams
- Provided bidding and construction phase services
Client:
Roanoke Valley Broadband Authority
Service Type:
Civil Engineering
Project Value:
$6.8 Million
Completion Date:
2015
Project Area:
85 miles (buried)