T&L partnered with the NRRA in late 2010 under the PPEA procurement method to act as the Design-Builder for the design, permitting, and construction of a new 13.5 acre landfill cell, 6.5 acre landfill closure and a new 10,000 SF maintenance facility at the New River Resource Authority Landfill in Dublin, Virginia.
The work for the project included:
- Design, permitting and construction of approximately 13.5 acres of new landfill area/cell;
- Removal of 475,000 cubic yards of sub-base material;
- Placement of approximately 600,000 square feet of composite liner system;
- Multiple permit amendments consisting of revisions to the stormwater management plan, construction blasting plan, leachate collection and refinements to the facility layout;
- Design, permitting and construction of an approximate 10,000 SF maintenance building and all associated utilities, parking and roadway;
- Design, permitting and closure of approximately 6.5 acres of landfill area to include the installation of a landfill capping system, 12 new gas wells and 2,200’ linear feet of gas collection system; and
- Design and construction of all required support infrastructure including utility extensions, access roads, and stormwater facilities.
Client:
New River Resource Authority
Service Type:
Designer Led Design Build
Project Value:
$9 Million
Completion Date:
2010
Project Area:
13.5 acre landfill cell
6.5 acre landfill closure
10,000 sf maintenance facility