Wilderness PSD – Water Project Experience
Location: Nicholas County, West Virginia
Feasibility, design construction administration and inspection of water systems consisting of the following projects:
Project: Phase I
100,000 gallon water storage facility
200,000 gallon water storage facility
350 gpm surface water treatment facility & raw water intake from Meadow River
20 mile distribution lines
Est. Cost: $2,000,000
Status: Begin 1977 Operational 1981
Project: Phase II Water Distribution System Expansion
Est. Cost: $150,000
Status: Begin 1982 Operational 1983
Project: Phase III Water Distribution Expansion with Two Pressure Booster Stations, and rate of flow controllers.
Est. Cost: $1,100,000
Status: Begin 1984 Operational 1986
Project: Phase IV Water Distribution Expansion with Booster Station, Two Storage tanks and rate of flow controller.
Est. Cost: $1,400,000
Status: Complete 1992
Project: Phase V Water Distribution Expansion with Two Pressure Reducing Stations.
Est. Cost: $1,300,000
Status: Design Complete in April 1997 – Operational 1998
Project: Phase VI Water Distribution Expansion with Two Elevated Storage Tanks, Booster Station and Two Pressure Reducing Stations.
Est. Cost: $3,700,000
Status: Operational 2003